
MICL Aaradhya Parkwood
Mahajan Wadi, Mira Road
Possession: Varies by tower · C/D occupancy reported
View projectSTART WITH THE DOCUMENTED TOWER
Compare ready-possession evidence for named Mira Road buildings. Each project below links to the developer’s published claim and explains what to confirm for the flat you’re considering.
Guide reviewed 24 Nov 2026 · 6 matching published projects
A SHORTLIST THAT FITS YOU
Share your budget, preferred layout and move-in timing. Our team will follow up about suitable projects and the details that need confirmation.
5 with published layout sizes · 6 with linked floor plans · 6 with a brochure link.
1 projects show a matching layout price. A publication date is recorded for 1 of those projects. Ask for a current itemised unit quotation before comparing budgets.
These counts cover project records in this collection. Confirm the phase, drawing revision and available units with the team.
MATCHING YOUR SEARCH
Only named Mira Road projects with a source URL and a completion-claim review within 90 days. Published project status does not confirm a particular flat is ready or available.

Mahajan Wadi, Mira Road
Possession: Varies by tower · C/D occupancy reported
View project
Chandan Shanti, Mira Road
Possession: Developer advertises OC received; confirm unit coverage and handover
View project
Kashimira, Mira Road
Possession: Developer advertises OC received; confirm unit coverage and handover
View project
Mira Road East
Possession: Developer advertises OC received; confirm unit coverage and handover
View project
Kashigaon, Mira Road
Possession: Occupancy reported for both Mira Crest towers
View project
Mira Road East
Possession: Developer reports OC/delivery for towers A–D and retail in November 2022; confirm selected unit and phase
View projectCheck the source for the relevant building. Ask for the occupancy certificate and schedule for your flat before relying on a move-in date.
MICL’s exchange filing reports occupancy certificate receipt for Towers C and D. Check the flat and tower against the certificate schedule. The same development includes separate ongoing towers A and B.
Published · Source reviewed · Read the developer’s statement
Developer page says OC received for Indraneel; unit and statutory document coverage not independently verified.
Source reviewed · Read the developer’s statement
Developer overview states OC received for North Imperia towers 1 and 2. Named registration matches; occupancy certificate copy and selected-unit coverage not independently inspected.
Source reviewed · Read the developer’s statement
Developer overview states OC received for North Aviva. Named registration matches; occupancy certificate copy and selected-unit coverage not independently inspected.
Source reviewed · Read the developer’s statement
Sonam reports occupancy for both Mira Crest towers. The project site identifies Mira Crest as Sonam Indradhanush. Request the certificate date and the schedule for the selected flat.
Source reviewed · Read the developer’s statement
Developer announcement reports occupancy certificate/delivery for towers A, B, C, D and retail; not all phases or current unit availability.
Published · Source reviewed · Read the developer’s statement
MBMC’s 2023–24 occupancy certificate register This historical register lets you see the certificate number, village and survey or CTS identifiers used for lookup. Ask the issuing authority for records beyond that period.
MahaRERA Order 33/2022 The order lists the architect’s Form 4 and the issued occupancy certificate separately. Ask to see the certificate issued by the competent authority.
Read the area basis alongside each layout. Published prices need a current unit quotation and a check of included charges.
| Project | Layout & area | Published layout price | Floor plans & possession |
|---|---|---|---|
| MICL Aaradhya ParkwoodMahajan Wadi, Mira Road | 1 BHK451.81 sq ft · Carpet area | Price on request | Plan on requestVaries by tower · C/D occupancy reported |
| 2 BHK669.95 sq ft · Carpet area | Price on request | Plan on requestVaries by tower · C/D occupancy reported | |
| Sonam IndraneelChandan Shanti, Mira Road | 2 BHK823.98 sq ft · Developer-published unit area; confirm agreement carpet basis | Price on request | View 2 BHK plansDeveloper advertises OC received; confirm unit coverage and handover |
| 3 BHK1,519.11 sq ft · Developer-published unit area; confirm agreement carpet basis | Price on request | View 3 BHK plansDeveloper advertises OC received; confirm unit coverage and handover | |
| JP North ImperiaKashimira, Mira Road | 1 BHK296 sq ft · Carpet area | ₹78 L12 Jan 2024 · Total price | Plan on requestDeveloper advertises OC received; confirm unit coverage and handover |
| 2 BHK · developer-listed typologyArea on request · Selected-unit agreement carpet schedule on request | Price on request | Plan on requestDeveloper advertises OC received; confirm unit coverage and handover | |
| JP North AvivaMira Road East | 1 BHK301, 391 sq ft · Published unit area; confirm agreement carpet area | Price on request | Plan on requestDeveloper advertises OC received; confirm unit coverage and handover |
| Sonam IndradhanushKashigaon, Mira Road | 2 BHK Type 1 · Mira Crest759.29 sq ft · Carpet area printed in developer project diagram; agreement/RERA basis to confirm | Price on request | View 2 BHK plansOccupancy reported for both Mira Crest towers |
| 2 BHK Type 2 · Mira Crest762.95 sq ft · Carpet area printed in developer project diagram; agreement/RERA basis to confirm | Price on request | View 2 BHK plansOccupancy reported for both Mira Crest towers | |
| 2 BHK · developer-listed 764 sq ft option764 sq ft · Carpet area in developer’s rounded typical-floor schedule; agreement/RERA basis to confirm | Price on request | View 2 BHK plansOccupancy reported for both Mira Crest towers | |
| MICL Aaradhya HighPark Phase IMira Road East | 1 BHKArea on request · Area on request | Price on request | Plan on requestDeveloper reports OC/delivery for towers A–D and retail in November 2022; confirm selected unit and phase |
| 2 BHKArea on request · Area on request | Price on request | Plan on requestDeveloper reports OC/delivery for towers A–D and retail in November 2022; confirm selected unit and phase | |
| 3 BHKArea on request · Area on request | Price on request | Plan on requestDeveloper reports OC/delivery for towers A–D and retail in November 2022; confirm selected unit and phase |
An occupancy announcement may cover only some towers in a development. At Aaradhya Parkwood, MICL reported an occupancy certificate for Towers C and D, while its October investor filing lists a separate schedule for A and B. Ask for the occupancy certificate number, date and issuing authority, then match the document and schedule to the tower, floor and apartment you want to buy.
Compare the actual apartment, not just the project name. Inspect ventilation, daylight, water supply, lift operation, noise and parking. Ask which facilities are delivered for the chosen phase and which maintenance or society charges apply. Larger developments can have completed and ongoing phases at the same address.
Completed construction does not establish available stock. Current unit availability and dated prices remain awaiting confirmation. Obtain a written quotation, exact drawing and handover terms, and have the transaction-specific documentation checked before paying or agreeing to a move-in date.
No. These are projects with scoped developer occupancy claims. Current unit availability, prices and handover arrangements must be confirmed separately.
Do not assume it does. Match the document’s phase, building and unit coverage to the apartment you intend to buy.
The source review must remain within the 90-day review window. A project can leave the collection when the review expires or its evidence changes; that does not by itself mean the building is unavailable.
Not necessarily. JP Infra’s current Atria and Elara descriptions say sold out and handed over. That differs from a named occupancy claim for Aviva or Imperia. Completion, developer stock and a specific resale apartment are separate checks; none should be inferred from the building’s age or an old asking amount.
Share your budget, layout and timing. We’ll confirm current unit options before arranging your visit.
Request a personal shortlist